Refrigerated dairy, packaged food and farm-equipment parts all end up in a warehouse before they reach a customer, and the South Plains sends a lot of freight through Lubbock. We build the cold, dry and rail-adjacent buildings that carry it: insulated tilt-wall coolers and freezers, food-grade dry storage, and distribution shells near the Lubbock Rail Port and the Reese Technology Center west of town. Ground temperature, wind and hail are the weather inputs, and we design the envelope for all three.
The investment is concrete. A March 2025 report says a cheese manufacturer opened the first phase of an 850,000 square foot facility in East Lubbock, which the Lubbock Economic Development Alliance CEO called the largest capital investment in Lubbock's history, at $1 billion and more than 600 jobs. A plant of that size consumes raw inputs, packaging and logistics, and it ships finished product in refrigerated trucks; the scale of the investment is a reminder that suppliers and service providers settle nearby. Warehouses for packaging, pallets, dry ingredients and cold finished goods follow naturally. Our cold storage warehouse work addresses that last piece.
We also build dry distribution and light industrial space for the many customers who are not food processors, and we will tell you honestly which parcel and structure suit them.
Reese Technology Center started construction in 2025 on East 90 Business Park, a 90-acre site across Research Boulevard from its campus west of Lubbock, with a $2 million Economic Development Administration grant plus $1.5 million from Reese, and first-portion roads and infrastructure expected by the end of fall 2025, according to KCBD. In an August 2022 announcement, the Lubbock Economic Development Alliance said a polyethylene pipe maker proposed up to 95 jobs and about $40 million in investment, including a possible second facility at the Lubbock Rail Port. Both are examples of land being prepared for industrial users.
TxDOT's Loop 88 page describes an approximately 12.4 mile project west of US 84 converting two-lane rural road to an access-controlled six-lane divided freeway with frontage roads. Sections 3A and 3B were completed in April 2026, and section 3C construction is scheduled to begin in fall 2026. For a developer, the loop is an emerging truck route around the west side of the city, and parcels near it will gain access.
The National Weather Service rates the May 11, 1970 Lubbock tornado F5, with 26 deaths, more than 1,500 injuries along an 8.5 mile track, damage covering 15 square miles, 250 businesses damaged or destroyed and about $250 million in damage in 1970 dollars. We mention it plainly because building owners in the city take severe weather seriously, and many ask about it at the start. A warehouse does not become tornado-proof by design choice, but there are things a builder can do: robust connections between roof and walls, wind-rated overhead doors, a shelter area for staff where the owner wants one, and roofing systems with good wind uplift ratings.
Insurers care about hail and wind in the same way, and a roof with a high impact rating may reduce premiums. Statewide, Texas led the country in hail events and tornadoes in 2024, according to the Insurance Council of Texas report cited in Insurance Journal, so insurers are paying attention. We price the options with the owner's broker so the choice rests on numbers.
For a refrigerated building, tilt-wall with insulated sandwich panels or interior insulated lining gives a tight envelope with good structural performance. Floors under freezer space need sub-slab heat or insulation to avoid frost heave. We coordinate with the refrigeration engineer on the machine room, evaporator loads, defrost drains and the electrical service.
Dry food storage needs a different design: sealed floors, pest control, tight dock doors and a layout that follows quality systems. Our food-grade warehouse checklist addresses the details. Where a manufacturer wants the cold and dry spaces under one roof, we draw a plan with an insulated room and clearly separated dry areas.
The cold chain and food sector is the clearest fit, but the region is also a market for farm inputs, equipment parts and building materials. Those users want dry, high-bay space with drive-in access for equipment and lots of outside storage. We have a template for each and adapt it to the site.
Packaging and pallet suppliers to food plants are a growing group. They need space close to the plant, deliveries in many sizes and quick turnarounds. A metal-building warehouse with a few docks and a large truck court often serves them well, at lower cost than tilt-wall.
Refrigerated space costs more than dry space because of the insulation, the refrigeration plant and the electrical service. We separate those costs in the estimate so an owner can see what the premium buys. Wind and hail design adds a smaller premium, mostly in roofing and doors.
Site work at Reese or the rail port depends on what the owner or the center provides. The EDA grant and Reese contribution cover first-portion roads and infrastructure, so a tenant may find the main roads are in. We confirm what is in place and what the tenant must add, and then compare against a parcel in Amarillo or the open ground near Midland.
On the South Plains, spring winds can slow crane work, and wind speed limits for lifting tilt panels are strict. We schedule panel casting and setting to avoid windy periods when we can, and we keep wind-speed monitoring on the crane. Slabs are cured in cooler, calmer conditions where the schedule allows.
A cold building needs time for commissioning after construction, including pull-down and alarm testing. We build that into the schedule and brief the operator's team before they bring product. Our cold storage facility plan sets out the steps.
Tell us the product, the temperature range and the site under consideration. We will return a building concept, a wind and hail review and a budget.
No building is tornado-proof, but we can strengthen roof-to-wall connections, use wind-rated doors, choose roofs with high uplift ratings and provide a shelter area when the owner asks for one. The structural engineer sets the design loads.
Insulation and often heat under the slab to prevent frost heave, plus a vapor barrier and a well-detailed edge. We design these with the refrigeration engineer.
Both can work. Tilt-wall offers a durable shell and good structure. Insulated metal panels can be faster. We price them for your temperature range and height.
Look at infrastructure in place, lease or purchase terms, access and distance to your customers. We lay the same building on each parcel and compare delivered cost.
They can. Crane lifts have wind limits, so we monitor forecasts and schedule panel setting when winds are lower.