Inbound parts arrive by the truckload and finished goods leave the same way, which makes the warehouse beside a plant part of the production line. A manufacturer that builds a distribution building next to its factory is solving a flow problem: how to stage components for the line, hold finished product until shipment, and release trucks without blocking the plant's own traffic. The building has to be sized for the line rate a year from now, not just today's.

We work with manufacturers in two situations. In the first, the plant already exists and needs a warehouse, a staging building or a dock addition. In the second, the manufacturer is siting a new campus and wants the factory, the warehouse and the truck court laid out as one site. The second case rewards early involvement, because the location of the shipping dock, the power service and the stormwater basin determine how the plant can expand later. Our manufacturing plant experience feeds directly into the warehouse side of the campus.

Distribution buildings tied to production run on different timing from a speculative box. The customer is the production schedule, and a delivery date that slips by a month can leave a finished line without anywhere to put its product.

Where Texas factories are creating warehouse demand

The north-south I-35 and east-west I-10 corridors outside San Antonio show the pattern. In Seguin, Area Development reported a $75 million, 125,000-square-foot stainless tube manufacturing complex on a 33-acre parcel in the Rio Nogales Industrial Park, just south of I-10, and the city's economic development corporation counts over 4,000 manufacturing jobs within city limits. A developer team is also planning the 164-acre Seguin Exchange Commerce Park at I-10 and Highway 46, with more than 2 million square feet of industrial space in buildings from 30,000 SF to 1.3 million SF. A factory cluster that dense needs warehouse space in varied sizes, which is what that range suggests. We follow the Seguin corridor for that reason.

Farther north, semiconductor investment is changing the scale. Samsung announced a $17 billion plant near Taylor, and GlobalWafers opened a wafer factory near Sherman with a reported $5 billion investment. Neither is a warehouse, but each draws suppliers, chemical and gas distributors and equipment service firms who need receiving buildings close by. Those are the buildings we build.

What manufacturers need that a speculative box does not

A plant-side warehouse often has to talk to the factory. That can mean an enclosed conveyor bridge, a climate-controlled connector, a shared dock yard or a truck route that crosses the plant's fire lane. We resolve those interfaces during design, because they involve two sets of codes, two operators and sometimes two fire protection systems that must be coordinated at the connection.

Product dictates other requirements. A building that stores finished goods sensitive to temperature, humidity or dust needs a different envelope and HVAC system than a general warehouse. Heavy finished goods may need a thicker slab or reinforced lanes for forklifts with high wheel loads, and some manufacturers want crane-ready bays for loading oversize product. We ask what the heaviest unit weighs, how it is moved and what happens if the unit is dropped, because those answers define the floor and structural design more than the floor area does.

Services that tie a plant and its warehouse together

Most manufacturer projects combine several service lines. Warehouse expansion is common where a plant has outgrown an existing building, and the work has to proceed with the building in operation, with temporary walls, protected product and a phased fire alarm tie-in. The site utilities package covers the power, water, sewer and stormwater lines serving a new building, which at a manufacturing site can include process water and wastewater coordination.

The tie-in of a new warehouse into an existing plant's utilities is where schedules slip, because outages have to be negotiated with production. We schedule tie-ins into planned shutdown windows, build and test as much as possible in advance, and stage materials so the connection itself is a matter of hours, not days.

Building around a production schedule

A manufacturer's calendar has fixed points: a line startup, a customer program launch, a shutdown week. A warehouse built to support the launch has to be finished before it, with racking, systems and inventory in place. For a program like the Samsung plant near Taylor, which a public profile says began limited operations in 2025 while construction continued, nearby suppliers may also need space in stages. We plan phasing for owners facing that reality, delivering usable space in stages instead of one date.

Phasing means the first bay is turned over complete, including fire protection and egress, while later bays are still being built. It costs a little more in temporary protection and inspection coordination, and it can bring a revenue-producing area online months earlier. We map the phases with the plant operations team, then confirm each turnover date with the fire marshal and building official, so partial occupancy is permitted, not assumed.

One accountable builder from site to dock

Manufacturers dislike managing many contractors. We take responsibility for the pieces on a project that can be coordinated by one builder: earthwork, utilities, concrete, tilt-wall or metal-building structure, roofing, dock equipment and paving. We schedule, supervise and inspect the concrete and structure trades that control the schedule, and we buy out the specialty trades early so their lead times show up in the plan.

We also translate between the manufacturer's engineers and the building trades. An equipment foundation drawing from a machine vendor, a clean room spec from a process engineer and a sprinkler design from a fire protection engineer all need to land on the same set of building drawings. We keep a coordination log and hold regular reviews with the owner's team so that questions are answered before work is under way, not discovered in the field.

Neighboring buyers who face related questions

The manufacturers we serve often share supply chains with other segments we build for. A parts maker that ships to car plants has the same concerns as the operators in automotive parts distribution, including sequenced delivery and line-side staging. A producer of fixtures, pipe or lumber products shares storage and loading requirements with building products distribution, such as wide covered yards and heavy forklift traffic. Where an advanced manufacturer's campus is surrounded by suppliers, the same building types repeat.

That crossover helps clients. A building designed for a manufacturer today may be leased to a distributor or logistics user later, and we design with that second life in mind, with regular column grids, standard clear heights and docks that can be reactivated.

Tell us about the line and the launch date

Share the production rate, the product weights, the connection to the plant and the date the line starts. We will return a site layout, a phasing plan and an estimate that separates the building from process-related work.

Common Questions

Should the warehouse be attached to the factory or separate?

Attached buildings save on conveying and weather exposure, but they complicate fire separation, expansion and future sale or lease. A separate warehouse across a truck court is easier to permit and expand and costs more in handling. We lay out both options with travel distances and fire wall requirements so operations and finance can compare the full picture.

How big should the truck court be for a plant-side warehouse?

Larger than most first drawings show. Semi-trailers need turning room, queue space and staging, and a plant often has both inbound parts trucks and outbound finished goods trucks arriving at overlapping times. We design the court using your truck schedule and add reserve space so the plant does not have to give up parking or lay-down when volume grows.

Can a manufacturer's warehouse be designed for later lease to someone else?

Yes, and it is a good hedge. Regular column spacing, standard clear heights and dock positions that can be reactivated keep the building marketable to distributors and logistics users. Specialized features such as heavy floors or process utilities can be designed so they remain useful or can be removed. We note which elements are plant-specific in the drawings.

How do we handle power for a new plant and warehouse?

Start with the utility. Transformer lead times, service voltage and any load study affect the schedule, and ERCOT, which says it serves about 90 percent of the state's electric load, sits behind most Texas utilities. We bring the utility into the project early and phase electrical gear purchases so the longest-lead items are ordered first.