Cedar Hill
Category
Service Areas
Service Area
Communities across Texas
Next Step
Request a Project Review
Category
Service Areas
Service Area
Communities across Texas
Next Step
Request a Project Review
Developers comparing industrial park sites along US-67 south of Dallas need a builder who prices the ground as carefully as the building, and Cedar Hill gives us both to work with. Along S. US-67, south of Mount Lebanon Road, Hillwood Investment Properties has laid out High Point 67 over more than 180 acres, with room to grow to two million square feet. That size supports phased delivery: a first shell for the lead tenant, then further buildings as demand fills the park.
Pratt Industries chose that park for a one-million-square-foot occupancy, with more than $200 million of investment and 150 full-time jobs, according to coverage dated April 15, 2022. We read a commitment like that as a signal about what the corridor supports: large footprints, heavy floor loads and constant truck movement. A user that big sets the dock layout, trailer count and power service on day one. A shell-only buyer asks different questions, mostly about column spacing, clear height and how the box can be split among tenants later.
Truck access is the second test. Tenants want to move from the dock to the highway without crossing neighborhood streets, so we study entry geometry, turning radii and queuing room before we agree to a footprint. We schedule, coordinate and inspect the trade partners who pour the floors and set the tilt panels, and our job is to keep those pieces on a single sequence. Owners planning a building ahead of a tenant should start with our speculative warehouse shell approach.
The city spreads over 35.9 square miles with ground near 800 feet above sea level, and Cedar Hill ISD serves most of it. For us that means a spread of site types: open park land along the US-67 corridor, smaller infill parcels nearer the residential streets, and ground on the western side near the water. Each one gets its own review of haul routes, adjacent uses and utility availability.
Owners who are also weighing sites in Grand Prairie or Arlington can have us price the same program in each place. The comparison usually turns on land cost, tenant labor access and how quickly a permit moves, so we build the numbers side by side before a buyer commits.
A typical Cedar Hill package starts with site grading, utilities and a tilt-wall shell, then adds the slab, dock equipment, canopies and the truck court. Where a tenant wants rail, we coordinate switch location, spur geometry and loading doors with the railroad and the civil engineer so the track and the building agree before steel or panels are ordered.
Truck courts get their own attention. Heavy, repetitive wheel loads on a trailer apron call for thicker concrete and better subgrade than a car lot, and we detail joints to match. Our work on truck courts and trailer yards covers those design choices.
Park projects rarely stop at four walls. Water, sewer and storm connections have to be sized for the whole park plan, not just the first building, which is why we price the site utilities package alongside the shell. A line sized for a single tenant can become a bottleneck once the second and third buildings arrive.
Fire protection, power and office build-out follow the same logic. We coordinate sprinkler design, switchgear lead times and mezzanine offices early so none of them delays occupancy. Buyers that need an expansion path get a shell that already allows for it.
Manufacturing and distribution users read the same corridor differently. A plant wants employee parking, shift-change traffic capacity and utility service sized for equipment. A distributor wants dock doors, trailer stalls and a route to the interstate. A park built on 180 acres can host both, and we help owners decide how to divide the ground so neither type blocks the other.
With 150 jobs attached to one occupant, parking ratios and driveway counts become real design drivers rather than afterthoughts. We raise those questions during preconstruction and bring them to the city early. For manufacturers who also ship product, our page on manufacturing and distribution explains how we plan production and dock space in one building.
The best fit here is the tilt-wall box, from 100,000 square feet up to the million-square-foot class. Tilt-up panels give a tall, clean interior at a competitive cost per square foot, and they go up quickly once the slab is cured. Our overview of tilt-wall buildings explains panel design, bracing and erection sequence.
Light manufacturing, parts assembly and small-bay flex fit on the edges of a park, where smaller lots and lower dock counts make sense. We design each so the tenant is not forced into a layout meant for another use.
We begin with a site study and a program, then price three things in parallel: the building, the site, and the schedule risk. That gives a developer a real number before land closes. We bring structural, civil and mechanical input into a single estimate so that changes are traced to their cause.
In the field, the concrete, steel, panel and electrical partners work to our schedule under our supervision and inspection, and we keep a weekly look-ahead that shows long-lead gear. Owners see the schedule, not just the budget.
Cedar Hill sits on an Austin chalk uplift, and the topsoil is gumbo clay that is thin in places and many feet thick in others. That clay expands after rain and contracts in drought, which punishes slabs and pavements that are not designed for it. We rely on the geotechnical report to set moisture conditioning, lime or cement treatment, and the depth of select fill under floors and truck courts.
The western Lake Ridge area is lower, on Eagle Ford shale around the 6,469-acre Joe Pool Lake reservoir, filled in 1986, with Cedar Hill State Park taking 1,826 acres of its northeast corner. Sites near that shoreline need drainage and groundwater review, and buyers should expect the geotechnical scope to be larger there than on the upland chalk.
A park under development has deliveries, equipment and finished buildings sharing the same roads. Our site safety plans separate construction traffic from tenant traffic, mark crane swing zones and control access at each gate. Tilt-wall erection receives a lift plan for each panel, and bracing is inspected before and after wind events.
We also keep a written plan for stormwater controls, dust and mud tracking on public roads. Those items draw attention from inspectors and neighbors alike, and they are cheaper to prevent than to fix.
Tell us the tenant profile, the building size and the date you need keys. We will respond with a layout, a budget range and a schedule.
The park corridor along US-67 has room for buildings well past 500,000 square feet, and one user there is planning to occupy a full million. Smaller infill sites support 50,000 to 150,000 square foot buildings. We test a footprint against truck circulation before recommending a size.
Not for most users. Rail matters to bulk, building-product and some manufacturing tenants, and if yours is one, we coordinate the spur with the railroad early. A tenant that ships only by truck is usually better served by extra trailer parking.
It moves with moisture. Without treatment, it can crack slabs and heave pavements. The fix is design based on the geotechnical report, including treated subgrade, moisture control and joint layout, and it adds modest cost compared with repairing a floor later.
Yes. We price the shell with the site work and a menu of tenant improvements, so a later user can add offices, racking power and dock equipment without tearing out finished work. The shell design keeps clear height and column spacing flexible.
Before closing on land if possible. Utility capacity, drainage and soil treatment can change the land value, and we can give a budget in weeks that lets the buyer negotiate with facts.