In Cleburne, a developer has enough ground to design the court properly instead of squeezing it in, and that matters because truck turns decide whether a cross-dock earns its rent. Amazon began building a 1.7-million-square-foot, $200 million facility here, about 30 miles below downtown Fort Worth, with up to 1,000 jobs, according to Dallas Innovates on November 7, 2024. A project of that size is a reminder that trailer traffic in this county will keep growing, and that neighboring tenants will want yards that hold up.
We design cross-dock buildings from the apron outward. How many doors face the court, how deep is the apron, can a tractor-trailer turn without backing, and where do drivers wait? Those questions set the building width and the site depth before any structure is drawn. A 130-foot to 185-foot court, one-way circulation and separate employee parking are typical starting points, and we adjust them to the carrier or shipper who will use the building.
The second market is the owner of an industrial park parcel with a rail option. Cleburne has many railroads, and BNSF handles much of the freight that passes through, so the question of rail service comes up often. We cover truck-first designs in our cross-dock facilities work and bring in track engineers when rail is part of the plan.
The most direct fit is the truck terminal and cross-dock: a long, narrow building with doors on both sides, light interior columns and a floor that handles constant forklift traffic. A freight carrier may need 80 to 200 doors, while a retailer's cross-dock may need half that with more staging room inside.
Beyond terminals, we build distribution centers, manufacturing buildings and truck maintenance shops. Each has a different need for slab thickness and clear height, so we start from the equipment and the product, then choose structure. A trailer-heavy site also needs paving that matches the load, which we cover below.
Among the larger names in Cleburne's economy are Wabash National and The Greenbrier Companies on the trailer and railcar side, Johns Manville and James Hardie Industries in building materials, and a Walmart distribution center. That is a mix of retail logistics, building products and transportation equipment, and every one of those businesses leans on trucks and rail.
Suppliers and service firms follow such employers, and many want a cross-dock or a transfer point nearby. We serve retail and building-products shippers with buildings sized for their pallet and truck counts. Our page on building products distribution describes the covered storage and outdoor yard layouts these users prefer, and our retail distribution page covers store replenishment buildings.
Cleburne Regional Airport belongs to the city and is open to the public, with 440 acres and a single paved runway of 5,697 by 100 feet. Parcels near an airport can have height limits for cranes and structures, and owners of an airport-adjacent site should check restrictions before design. We do that review as part of site selection.
State oversight covers US Route 67 and Highway 174 inside Cleburne, so driveway locations, turn lanes and signals are subject to state review on those roads. A site on a city street may move faster through permitting, but it may have worse truck access. We compare the options, and clients also weigh sites in Fort Worth and Arlington against Cleburne using one budget.
Our preconstruction process puts the site and the traffic first. We draw truck paths at full scale, test them against the property boundary and the stormwater plan, and then fit the building. This can change a rectangle into an L-shape or move the office to a different corner, but it saves money when the building opens.
We schedule, coordinate and inspect the concrete, steel, panel and paving partners, and we track every long-lead item. Owners get a weekly report with photographs and an updated risk list, so lenders and tenants can follow progress without calling the site.
The city reviews the site plan and building permit, and the fire department checks apron width, hydrant spacing and sprinkler design. A cross-dock with 100-plus doors needs a clear fire lane around the building, and high-piled storage inside brings sprinkler requirements that we coordinate through our ESFR fire protection coordination process.
Stormwater rules apply to the large paved areas that cross-docks create. A 15-acre site with 10 acres of concrete sheds a lot of water, and the design must handle it with detention and controlled outfall. We bring the civil engineer into the first layout so the basin does not take the space needed for trailer stalls.
A full scope includes clearing, mass grading, utilities, the building shell, slab, dock equipment, canopies, truck court paving, lighting, fencing and security. The truck court is often the largest line item in a cross-dock budget, so we detail it carefully: thick reinforced concrete at dock aprons, joints sealed to resist water and fuel, and drainage that keeps water away from tires.
Surface soils across Cleburne range from sandy clay loam to a dark clay rich in calcium carbonate. The clay portions move with moisture, so we rely on geotechnical recommendations for subgrade treatment and base thickness. Skipping that step can lead to rutted aprons and cracked slabs within a few years.
A cross-dock site is an active traffic zone even during construction. We set separate gates for construction vehicles and visitors, post speed limits and use flaggers where deliveries cross work areas. Tilt-wall panels are erected with a lift plan for each piece, and bracing is inspected daily.
Concrete placement near trucks calls for barricades and notices to drivers. We also hold weekly safety meetings with each trade partner and keep records of inspections, near misses and corrective actions.
Send the door count, trailer volume and target date. We will respond with a layout, a budget range and a schedule.
It depends on freight volume, trailer dwell time and shifts. A regional carrier terminal may need 100 doors or more, while a retailer's cross-dock may need 40 to 60. We model dock use with your numbers before setting the building length.
Rarely. Rail helps bulk and manufacturing users. If you want it, we coordinate with the railroad early, because track design and approval take time.
It depends on traffic and soil, but dock aprons typically use 7 to 9 inches of reinforced concrete, with lighter sections elsewhere. We set thickness from the geotechnical report and your truck counts.
It can, depending on the distance and the approach paths. We check the restrictions before design and plan cranes accordingly.
Yes. We often build the first half of a long cross-dock and leave the site ready to extend the building and court later.