Flex buildings near DFW Airport serve contractors, parts suppliers, tech firms and trade-show vendors who want an address close to the terminals, and Grapevine includes a larger portion of the airport than neighboring cities. DFW Airport handles most of the air service for Grapevine and the area around it, so a company that ships by air or services airport tenants can sit a short drive from the cargo gates. For a developer, the question is how to give those tenants a building with offices in front and storage behind.
We build that mix: bays of 1,500 to 6,000 square feet, 18 to 24 feet of clear height, grade-level and dock-high doors, a finished front for showroom or office, and paved areas for vans and box trucks. Light industrial buildings can have deeper bays, taller ceilings and heavier electrical service for assembly or light manufacturing.
We also consider the truck side. Some tenants receive tractor-trailer deliveries, so the court needs to turn them. Our flex and light industrial page shows the layouts we offer, and our truck court and trailer yard work explains the paving and turning design.
The Gaylord Texan Resort (2,000 employees) and the airport itself (1,980) lead the city's 2022 report, while the school district shared with Colleyville employs 1,700 and Paycom 900. Hospitality and airport employment create demand for suppliers: linens, food, equipment, maintenance and event services. Many of them need a few thousand square feet of storage, a dock or a roll-up door, and a place to park a truck, which is the flex building in its simplest form, and a developer can lease it in small increments. Our manufacturing and distribution clients with light assembly needs rely on the same bay design.
The Gaylord Texan broke ground in September 2016 on The Vineyard, a $120 million expansion adding 303 rooms to its 1,511 and 86,000 square feet of meeting rooms with carpet. A resort that size relies on vendors who store and deliver on a schedule, and many of them operate from flex buildings nearby. We build those buildings with the loading, storage and office mix such vendors need.
Grapevine Lake, a large reservoir created in 1952 by an Army Corps of Engineers impoundment, sits next to the city. Land near the lake may have floodplain, shoreline or setback restrictions, and a developer should check them before buying. We review mapping, geotechnical conditions and drainage in the first site study, and we report what the survey shows before the owner spends on design.
Rail runs through town as well. Commuter rail (TEXRail) stops at two Grapevine stations, DFW Airport North and Main Street, while the Grapevine Vintage Railroad follows the old Cotton Belt corridor toward the Stockyards in Fort Worth. Sites near those tracks may have noise, vibration and crossing access issues, and we plan construction access with them in mind. The airport adds height limits on cranes and structures. None of these constraints rules out a site, but each affects cost and schedule, and we put numbers on them before an owner closes. A shoreline parcel, for instance, may need extra stormwater treatment, while a rail-adjacent one may need a sound wall for office tenants.
Flex buildings are cheaper per square foot than office buildings and more expensive per square foot than bare shells, because of offices, storefronts, individual meters and restrooms. The mix of office and warehouse space is the largest cost variable, and we price it by bay.
Site costs also matter. Grapevine is largely developed, so infill sites may require demolition, utility relocation or drainage work. We include allowances for these costs and update them as investigation proceeds. Individually metered utilities, rated demising walls and storefront glazing are the items that separate flex from plain warehouse pricing, and each can be added or removed by bay. Owners can compare the economics with sites in Irving and Lewisville through one budget.
The city reviews site plans, drainage and building permits, and the fire department reviews access and sprinkler design. SH 114 and SH 121 are both grade-separated freeways crossing town, and SH 360 also appears among its major roads, so driveways onto those roads may require TxDOT review. We bring the review into the schedule at the start.
Use groups matter for flex. A bay with light assembly, a vehicle shop or paint storage may carry fire or ventilation requirements. We identify each tenant type in advance and design to the more demanding case when it is reasonable. That avoids costly changes during tenant improvements. A building shell can also be built to allow a later upgrade of sprinkler density, so a bay can change use without a major retrofit.
Flex projects often need parallel services, and owners should expect to review them together: site utilities, paving, lighting and storm drainage. We price them with the building so owners see the full cost. Where tenants need cross-dock style access, we can add dock positions on one side of the building.
For larger users, our cross-dock facilities work shows how we design truck courts, apron depth and door spacing. A flex developer with a larger parcel can mix small bays with a cross-dock building, sharing utilities and drives, which lowers the cost per square foot of both. We schedule, coordinate and inspect the trade partners across both buildings and report weekly. Arlington provides a point of comparison for larger sites.
Give us the parcel, the bay mix and the target tenants. We will send a concept, a budget range and a schedule.
Many use 1,500 to 6,000 square feet, with a mix of office, showroom and storage. Larger bays suit vendors with trucks. We design a range so the developer can lease to different tenants, and we can show how the mix affects total rent.
It can. Height limits, noise and flight paths affect cranes and some design choices. We check the rules during site review and plan lifts accordingly.
Yes, if the site is big enough. A combined plan shares drives and utilities, and we phase construction to fit leasing. The smaller buildings can lease first while the larger one is still being designed, which keeps income flowing and tests demand for the bigger building.
Check mapping and setbacks first. We review them with the civil engineer and adjust the layout so the building avoids restricted areas. If part of a parcel is limited, it can often serve as parking, detention or landscaping, so the land is not wasted.
Usually 9 to 13 months from permit, depending on size and the number of buildings. Utility work and inspections are the main schedule factors.