Express freight is a deadline business, and a building that handles it has to be designed around the aircraft schedule. We build air-cargo support facilities in Harlingen: parcel sort buildings, forwarder warehouses and last-mile hubs near the airfield, with flat slabs for conveyors, ample truck docks on the landside and fire protection that matches the commodity. The goal is a building where a truck can pull in minutes after a freighter lands and leave sorted.
The airfield has been upgraded for that traffic. Airport Improvement reported in September 2024 that Valley International Airport extended its main runway from 8,400 to 9,400 feet between December 2022 and July 2024, at an estimated $35 million with about 80 percent funded by the Airport Improvement Program, so FedEx and DHL freighters can reach 70 percent of maximum gross takeoff weight. The Harlingen Economic Development Corporation lists a 479-acre aerotropolis next to the airport, with an 82-acre largest contiguous developable parcel, reached by FM 509 which links to I-69 and I-2.
That combination of air, highway and open land is useful to a parcel carrier, a forwarder or a manufacturer that ships high-value goods. Our last-mile parcel hub experience applies directly.
We start a cargo building by mapping time. When does the aircraft land, how long until the first truck must leave, and how many pieces move through each hour? From those numbers come the sort floor length, the number of doors and the staging space. A building that handles 3,000 pieces an hour looks different from one that handles 30,000.
Conveyors and sortation equipment are usually supplied by the operator, so we coordinate floor flatness, pit and trench locations, power and structural supports for overhead equipment. We pour the slab with those in mind, using laser screed and flatness checks where the equipment demands it. The operator's engineer gets a pre-pour coordination meeting, which keeps embeds and penetrations in the right place before concrete is placed.
Airport construction brings requirements that ordinary industrial building does not. Height limits near runways, notification for cranes, lighting restrictions, security badging and controlled access for workers and vehicles are common. On airport-owned land the lease also sets design standards. We read these documents at the start and build the compliance steps into the schedule.
The runway extension itself was built between December 2022 and July 2024 while the airport stayed open, which shows the standard: a contractor next door has to coordinate with an airport that is still operating. That means planning deliveries, keeping loose material from becoming debris on the airfield and agreeing on work windows with airport operations. We assign one superintendent as the airport's single point of contact.
Dust and debris get special attention. Loose gravel, plastic sheeting and packaging can blow onto an airfield, so we cover stockpiles, sweep haul routes, tie down materials at the end of each shift and keep a clean site. Tall equipment, such as the crane that sets tilt-wall panels, is scheduled with the airport so the lift plan, boom height and lighting are cleared in advance.
The users that value air access most are e-commerce sellers promising fast delivery, manufacturers shipping time-sensitive parts and produce or perishable shippers. We build for ecommerce fulfillment operators who want a facility close to the airfield and the highways. Some of them need cooler rooms for perishable goods, others need secure cages for high-value items. Our logistics and fulfillment center designs cover both.
Ground handlers and aircraft service companies are another group. Their buildings combine hangar-style space with warehouse and office space, and the structure often needs clear spans and tall doors. We have the know-how to design that kind of hybrid.
Not every user needs to be next to the runway. The EDC owns roughly 65 acres in its Industrial Park at Roosevelt, available for sale or lease with direct access to Interstate 69 E. That site suits warehouses and distribution buildings that need the highway more than the aircraft. A typical building there is a 50,000 to 200,000 square foot tilt-wall or metal shell with a modest office and a dock court on one side.
Because Harlingen sits at the junction of US 77 and US 83, designated I-69E and I-2, and is the eastern end of I-2 according to Wikipedia, it can serve trucking in several directions. We compare an airport parcel with a highway parcel using a shared building design so the owner can see which costs less delivered. A distribution center on the Roosevelt site, for instance, avoids the airport review layer entirely, which may save months.
A cargo building stores a mix of commodities, and the sprinkler design depends on the highest hazard. Lithium batteries, aerosols and plastics change the requirement. Our ESFR fire protection coordination sets the design commodity with the operator, the insurer and the fire marshal.
Texas sets the International Building Code as the baseline for municipal commercial work and lets each city adopt amendments, so we confirm the current local edition. State accessibility registration applies to projects of $50,000 or more. If any part of the site is on airport property, the airport authority may also review the plans.
Parcel and e-commerce volume peak in the fourth quarter, and an operator who wants a new sort building ready for peak needs it complete well before October. We work back from that date. Long-lead items, such as sortation conveyors, dock equipment and switchgear, get ordered first. The building is scheduled so the operator's equipment installer has several weeks inside a dry, powered shell before go-live.
Operators spread across the Valley sometimes pair Harlingen with Brownsville for port-linked freight or with Edinburg for another airfield. We can schedule the buildings together so crews and materials move efficiently.
Tell us the aircraft schedule, the pieces per hour and the equipment supplier. We will return a sort floor concept, a site review and a budget.
It depends on the equipment. Conveyors and automated systems often call for tighter tolerances than a standard warehouse. We get the specification from the equipment supplier and plan the pour method to meet it.
No. Airside access is valuable for some operations, but most parcels and forwarders can work from an industrial park a short drive away. We price both so you can see the tradeoff.
At contract signing or sooner. Lead times can run several months, and the building schedule is built to receive the equipment when it arrives.
Yes. We build insulated rooms, refrigeration and vapor barriers within the shell, and we coordinate the power and drains for them.
From 20,000 square foot forwarder warehouses to sort buildings of several hundred thousand square feet. The size depends on throughput, not just the available land.