Round Rock
Category
Service Areas
Service Area
Communities across Texas
Next Step
Request a Project Review
Category
Service Areas
Service Area
Communities across Texas
Next Step
Request a Project Review
Returns processing, parts depots and technology distribution all want the same thing from a building: dependable power, tight inventory control and fast truck access to a major interstate. In Round Rock we build warehouses and light-industrial distribution space for that mix, with controlled dock access, mezzanine pick modules and floors flat enough for narrow-aisle equipment. The city is the international headquarters of Dell, and its list of more than 20 major employers includes Cerilliant, Cintas, Dresser, Emerson Process Management, Hospira, IKEA, KoMiCo Technology, Round Rock Premium Outlets, Tekscend Photomask and TECO-Westinghouse.
We cite that list to show the breadth of users, not to claim any of them as clients. A technology manufacturer, a uniform and facility-services company, a controls manufacturer, a furniture retailer and a photomask maker each store and ship different things, and each would specify a different building. A market with that range supports small-bay flex buildings, mid-size regional distribution centers and a few larger shells, and we are comfortable in all three.
Round Rock is served by I-35, US 79, State Highway 45 (including the SH 45 toll road) and the State Highway 130 toll road. That combination lets a truck leave a Round Rock dock for Austin, Georgetown or the north side of the metro without sitting in the main interstate backup.
The most common Round Rock request is a flex or light-industrial building in the 30,000 to 120,000 square foot range, with a small dock count, drive-in doors and a front-office component. Those buildings suit parts distributors, service companies and technology suppliers who want a dock for freight but also need a clean interior for assembly, test or kitting. We design the front elevation for employees and visitors, and the rear for trucks.
A second profile is a regional distribution center with 32 to 36 feet of clear height and cross-dock or rear-load docks for a customer base in Williamson and Travis counties. Both profiles need an efficient truck court, and the third profile, a build-to-suit for a specific operator, comes from the same toolkit.
Each of the four roadways serves different freight. I-35 handles the long-haul north and south trucks and carries the heaviest congestion. US 79 runs east and west and reaches the town of Taylor and beyond. The SH 45 toll road cuts west and then south around the metro, and the SH 130 toll road gives the bypass that avoids the central city. A tenant who moves freight outbound to the north and east has a different best site from one serving south Austin and Hays County.
We use a simple test with every parcel: can a loaded truck get to the toll road, to I-35 and to the customer within the delivery window, at the hours that the tenant ships? Toll costs are an operating cost, so we pass the numbers to the owner and let the tenant decide how much time they save per toll dollar.
The city takes its name from a large round rock that served as a low-water crossing on Brushy Creek, and the Brushy Creek Municipal Utility District is the city's largest district. The history is a reminder that creeks shape the land, and a warehouse parcel near one will carry floodplain mapping, detention requirements and utility district rules. Statewide, the Texas Water Development Board's first state flood plan was built from 15 regional flood plans, and flood risk is a standard line in the due diligence of any industrial site.
We look at the floodplain map, the creek buffers and the drainage easements before we draw a pad. Where a parcel carries a detention requirement, we plan the pond as part of the truck court, not an afterthought, and we carry its mowing and inspection access into the site design.
Technology and parts distribution, which sits close to the e-commerce fulfillment world in how it handles returns and small parcels, tends to need more power and cleaner interiors than a typical dry-goods box. We can plan extra electrical capacity, conditioned zones, anti-static flooring where required, and a mezzanine for light assembly or kitting. The slab is where the detail matters: a floor designed for narrow-aisle trucks needs tight flatness and levelness numbers, and we describe how we get there in our super-flat floor slab page.
ESFR sprinklers are standard for high-piled storage, and we work out the fire protection design with the engineer so the roof structure, the sprinkler layout and the rack plan agree on day one. That avoids field changes that delay the certificate of occupancy.
We schedule, supervise and inspect the earthwork, paving, slab and tilt-panel scope that sets quality and schedule on a warehouse job. That includes the sub-base and the curing plan for a slab that will carry loaded rack, the dock aprons that take the heavy braking loads of trailers, and the panel lift that closes the shell. Managing those pieces closely means the work does not stall when the weather window opens.
The trades we coordinate are the ones with specialized licensing and long lead times: fire protection, electrical gear, refrigeration and dock equipment. We publish a lead-time list at the start of every job and update it weekly, so the owner sees early if a transformer or a leveler is the item that controls the date. Our dock equipment and levelers scope explains how we coordinate pits and frames with the apron pour.
Round Rock sits in one of the busiest development markets in Central Texas, so we plan for competing demand on inspectors, concrete suppliers and crane operators. We lock in crane time for tilt-up lifting early, schedule concrete deliveries around the plant's capacity, and give the owner a weekly look-ahead during the pour and lift stages.
A typical sequence is site work and utilities, footings, slab, panel casting, lift, roof, dock equipment and finishes. On smaller flex buildings we compress the schedule with pre-engineered metal components; our speculative warehouse shell program shows how the base building is delivered first and the tenant finish comes later.
Share the parcel, the product and the lease date you are working toward. We will return a layout, a schedule and a budget range, and we will flag any drainage or power issue that could change the price.
Flex and light-industrial buildings between 30,000 and 120,000 square feet are the most common, with regional distribution shells in the 100,000 to 300,000 range for larger operators. We size dock count and truck court to the operation rather than to a standard ratio.
They can. A parcel with quick access to SH 130 or SH 45 saves truck time, and the toll is an operating cost to weigh against that time. We map the options for each parcel and let the tenant run the numbers.
Yes. We design for inbound dock volume, inspection and sorting zones, mezzanine space for pick modules and extra electrical capacity for conveyors and charging. The floor is built to the flatness the equipment needs.
Parcels near it can carry floodplain, detention and easement requirements. We review the mapping before design and plan the pond and the drainage paths with the site layout, so that these requirements do not eat into the truck court late in the process.