A roof that has been through a three-inch hailstorm tells a warehouse owner what to ask for next time. In San Angelo we build distribution and storage buildings whose envelope is specified for hail and flood first and everything else second: heavier roof membranes or standing-seam metal, protected rooftop equipment, finished floors set above mapped flood levels and drainage that moves water around the building. Our warehouse teams treat the weather record as part of the design brief.

The record is specific. A National Weather Service summary of the May 21, 2020 San Angelo hailstorm reports hail of 1.75 to 3 inches in diameter during about 90 minutes of a nearly stationary storm, causing considerable damage to vehicles and roofs across much of the city and Goodfellow Air Force Base. The NWS also records that the September 1936 Concho River flood brought 11.75 inches of rain on September 15, a South Concho peak of 111,000 cubic feet per second and, according to the local newspaper, 300 houses destroyed and 700 damaged. Neither event is a forecast; both are reasons to specify carefully.

We build for regional distributors, building materials suppliers and defense-linked users, and our approach is to price the resilient version first so the owner sees what it costs and can choose what to cut.

Roofs, equipment and the envelope

After a hail event, the first failures are roof membranes, skylights, rooftop units and metal panels. We discuss the options in plain terms: a standing-seam metal roof with heavier gauge panels, an adhered or mechanically fastened membrane with a cover board, hail guards on condensers and rooftop units, and impact-rated skylights or none. Each has a price, and the insurer's rate may reward some of them.

Walls matter less than roofs for hail, but dock doors, glazing and louvers are exposed. Tilt-wall panels resist impact well, while metal wall panels dent more. We use the owner's insurer and broker as part of the design team, since their guidance determines what saves money over time.

Flood history and site selection

The Concho River flood of 1936 is a long-ago event, but flood-prone ground does not change. We check the mapped floodplain, the local drainage and any history of ponding on each parcel before an owner commits. Where the lot lies near a creek, we raise the building pad, size detention for the new impervious area and route outflow to a safe discharge.

The cost of fill and drainage can be larger than expected. We include it in the feasibility estimate, along with soil conditions from borings, so the owner compares parcels on total cost and not just land price. If the best parcel is a bit off the main road, the avoided flood risk may pay for the extra utility run.

Goodfellow, defense contractors and regional supply

The Texas Comptroller reports that as of 2025 Goodfellow Air Force Base is home to 6,567 direct employees, including 5,516 active-duty military personnel, and that its affiliated population contributed at least $3.8 billion to the Texas economy in 2025. A base of that size draws a ring of service providers, suppliers and contractors who need warehouses for equipment, records and supplies. Some operate under security rules that affect the building: controlled entries, camera coverage and storage cages.

The city is also a regional distribution point for the Concho Valley, with building materials, food, farm and ranch supply and medical goods moving from here to smaller towns. We design buildings of 20,000 to 150,000 square feet for that role, with a few docks, drive-in access for equipment and flexible storage.

Building sizes and layouts

For a regional distributor, a typical layout is a rectangular shell of 50,000 to 100,000 square feet with docks on one long wall, a yard for trailers and a small office. For a supplier that handles long materials or equipment, we add a drive-through bay or a canopy. For a records or document storage tenant we specify a clean, dry, fire-resistant building. Our rack-supported buildings are an option when the owner wants high-density storage and a fast build.

A good layout leaves room to grow. We position the building, utilities and pavement so the owner can add a bay on one end without moving a driveway, and we install the knockout panel or end wall detail that makes the extension simple.

Highway timing and cost allocation

TxDOT's San Angelo North Relief Route study covers about 11 miles on new location between US 87 and US 67 north of the city, with three main lanes in each direction, interchanges at US 87, US 277 and US 67, and a proposed 500-foot right of way for potential Ports-to-Plains and I-14 corridors, with construction listed as beginning in 2032, subject to change. A project that far out is not something to build a plan around, but a land buyer should know it exists, since a parcel in the study area may be affected.

The resilient envelope is the largest premium; the route study is a risk to land value rather than a cost. We help owners compare parcels, including one in Abilene or in Midland, on delivered cost.

Defense suppliers, ranch supply and health logistics

The user mix is wide. Defense-related suppliers want secure, simple buildings. Building products distributors want yard space and canopies. Medical supply and pharmacy distributors want temperature control and clean, secure storage. Farm and ranch suppliers want drive-in bays and large doors.

We keep the base building simple and make the special features modular, so a change of tenant does not require a major reconstruction. A building with a robust shell, good power and flexible doors and docks can serve several kinds of users over its life.

Storm-season sequencing

Hail and storms come in spring and early summer. We set the roof early, protect materials on site and keep the building dried in before interior finishes go in. If a storm damages work in progress, we document it with photographs and weather records and file the claim promptly.

Concrete work avoids the heat of summer afternoons where possible, and tilt-wall casting is scheduled with the weather in mind. Our tilt-wall warehouse process includes a plan for temporary bracing and storm response on every project.

Plan a San Angelo building

Tell us the inventory, the parcel and the insurance concerns. We will return a resilient envelope option, a site review and a budget.

Common Questions

What roof holds up best to hail?

There is no single answer. Standing-seam metal of heavier gauge and membranes with cover boards both perform well, and hail guards protect rooftop equipment. We price options with your insurer.

Should I raise the floor above the flood level?

Where the parcel is in or near a mapped floodplain, yes. We set the finished floor above the mapped level and grade docks so water drains away.

Does proximity to Goodfellow matter for a warehouse?

It matters for demand, since service providers and suppliers cluster around the base. It can also bring security requirements that we design into the building.

How do I account for the proposed relief route?

Treat it as a risk to land use and access, not a plan. We check the study area and mark your parcel against it. Construction is listed for 2032 and may change.

What size building should a regional distributor build?

Commonly 50,000 to 100,000 square feet, with room to expand. We start from your inventory and delivery pattern.