Parcel carriers staging vans for same-day routes want a building on a state highway with a short drive to several dense zip codes, and Bedford offers that position in the Mid-Cities. SH 121 and SH 183 both serve Bedford, and the latter goes by the name Airport Freeway. A van leaving a Bedford dock can reach Hurst, Euless and the airport corridor in minutes, and a tractor-trailer can reach the same freeways without a long run through neighborhoods.
The city covers about 10.04 square miles in northeastern Tarrant County, borders Hurst and Euless and sits near 600 feet in elevation. A small, mostly developed city shapes the building we propose. Sites are modest, so a last-mile hub of 30,000 to 120,000 square feet makes more sense than a 600,000-square-foot box, and the layout has to give vans, box trucks and trailers separate paths on a tight lot.
We build that kind of space, from a single-tenant van hub to a speculative shell sized for the next e-commerce user. Our last-mile parcel hub page covers the pieces: sortation floor, van apron, charging, driver parking and office space.
A typical package covers site work, utilities, a slab, tilt-wall or metal walls, a roof, dock-high and grade-level doors, a van apron, lighting, security and fencing. Last-mile hubs use more grade-level doors than a classic warehouse, since vans load at ground level, and the floor plan opens to a sort area instead of a deep storage zone.
Inside, we leave space for conveyors, sort walls and a returns area. Electrical service needs special attention, because electric vans and chargers add substantial load. We size the service for the fleet the tenant expects in several years, not only the one on day one, and we place conduit now so chargers can be added later without tearing up pavement. Driver parking is the other surprise: a route-based operation can need a stall for every van plus a second field for personal vehicles during shift overlap.
Bedford reviews site plans, drainage and building permits, and the fire department checks access and sprinklers. In a developed city, tight lots and neighboring uses often drive comments about screening, lighting and truck turns. We submit complete packages and meet with staff early, so surprises appear before drawings are final.
Sprinkler design depends on what the tenant stores and how high. Parcel hubs store little, but e-commerce users with racking need more, and the difference can change pipe size, pump needs and cost. We coordinate that decision with our ESFR fire protection coordination process, and we confirm water supply early, since an undersized line can cost months.
Bedford Commons, a city partnership with Midway Development Group, LLC, lies south of Bedford Road and north of L. Don Dodson Drive, with plans that include townhomes, mixed-use pads for restaurants and shops, and an amenity lake with open lawn. A neighbor like that raises design questions for an industrial user nearby: noise, truck hours, lighting and access routes that stay off residential streets.
We handle those questions with site layout and operating plans. Putting docks on the side away from housing, screening with berms and walls, and limiting night lighting are standard tools. On every site, we study the route trucks take from the freeway to the gate and ask whether a stacked left turn or a short driveway will back traffic onto the highway.
Last-mile tenants have fixed launch dates, often tied to a contract with a retailer or a seasonal peak. We build the schedule backward from that date and mark the points where equipment vendors need access. On a small lot, laydown space is limited, so we sequence deliveries and store only what the day requires.
Long-lead items include electrical gear, overhead doors and charging equipment. We order them as soon as the budget is approved. We also schedule inspections early, since a missed inspection on a compressed schedule costs days that cannot be recovered. Related shell work is covered in our speculative warehouse shell approach for owners who want to build ahead of a tenant.
Texas Health Resources, with 1,480 employees, tops the city's 2023 financial report. A health system of that size buys medical supplies, equipment and food, and the vendors that serve it want small distribution space nearby. Parcel carriers, online sellers, building-trade suppliers and repair firms round out the likely users.
We design for these users with flexible buildings. Our e-commerce fulfillment page shows how we plan pick modules and pack stations, and we adapt the same ideas to smaller footprints. A tenant that starts as a van hub can grow into more storage if the shell has room. Medical and food suppliers serving the hospital system may also want a temperature-controlled room, and we can reserve space and power for one.
The city's position between busy highways and near the airport corridor means construction traffic competes with commuters and trucks. We plan haul routes and delivery windows around peak hours, use flaggers at entrances and keep streets clean. Cranes get a height check, since flight paths near the airport can limit lifting.
On site, we separate vehicles from workers, inspect excavations daily and maintain written lift plans for tilt-wall panels. All trade partners attend an orientation, and we record inspections and corrective actions. For owners considering nearby options, Irving and Arlington offer larger sites with similar highway access.
Tell us the route volume, fleet size and launch date. We will respond with a layout, a budget range and a schedule.
Most are between 30,000 and 120,000 square feet. The size depends on parcel volume, the number of vans and whether the tenant sorts on site. We size it from route counts and peak volumes.
Yes. They require more electrical capacity and charger locations. We size service and conduit for the planned fleet and leave room to grow.
Yes, as long as the shell works for several tenants. We design for flexible dock doors, adequate clear height and room for trucks, and we advise on whether a lot is big enough to compete. A lot that is too small for trucks to turn can still work as a van-only hub, which we also price.
Place the docks away from housing, limit hours at the gate and plan routes that avoid residential streets. We show the city a truck-route plan with the site submittal.
Typically 8 to 12 months from permit to turnover, depending on size, site conditions and equipment. Early utility coordination is the main schedule factor, and we begin it as soon as the site is under contract. Charging equipment and overhead doors can be the next-longest items.