Rainfall writes the earthwork schedule on a McKinney warehouse, and we build the calendar around it before we promise a delivery date. The city averages about 41 inches of precipitation a year, with May the wettest month, and it sits about 32 miles north of Dallas at an elevation of 577 feet. For a tilt-wall building that means grading, subgrade stabilization and slab placement all have to be sequenced so that a wet spring does not leave the pad under water on the day the panels are due.
We build distribution centers, light-industrial shells and aviation-adjacent warehouses for owners in McKinney who want a northern Collin County address with freeway access. U.S. 75 runs north to south and U.S. 380 runs east to west through the city, State Highway 5 runs north to south through Downtown McKinney, and SH 121 splits off to form the Sam Rayburn Tollway along the McKinney-Allen border. That is a useful grid for regional distribution, particularly for users who serve customers in Collin and Grayson counties.
On a first call we ask about the parts of the job that determine price: how many acres, how much of the site is in a drainage corridor, which utilities are at the property line and what the tenant needs on day one. Those answers set the shape of the spec warehouse shell or the custom building that follows.
McKinney is a good base for work up the U.S. 75 and U.S. 380 corridors. We cover Allen and Plano to the south, Frisco and Denton to the west along U.S. 380, and Sherman and Denison to the north along U.S. 75. Having one team across the corridor means a client who wants two buildings in different cities does not coordinate two builders.
It also helps with labor and materials. When a concrete supplier or erection crew is committed elsewhere, we can reroute resources across nearby jobs. That is a quiet but real advantage for owners with fixed move-in dates.
Three line items dominate a McKinney industrial budget. The first is site preparation, including clearing, mass grading, stabilized subgrade and detention. The second is the concrete package: footings, panels and slab. The third is MEP and fire protection, where ESFR sprinklers, lighting controls and electrical service size change with the tenant.
Weather is a hidden fourth item. Lost days in a wet season show up as extended general conditions, so we state a weather allowance in the bid and explain how it is calculated. We also look at options to reduce exposure, such as starting dirt work in the drier months, using lime or cement stabilization when subgrade is soft, and placing slabs under a short-term enclosure when the forecast turns. Owners comparing us with other bidders see the same assumptions on each line, which makes bid leveling cleaner. Our work on site utilities is priced with the same transparency.
Most projects fall into a few types. There are 50,000 to 150,000 square foot distribution and service buildings with cross-dock or front-load docks, flex-industrial space for contractors and suppliers, and specialty structures for aviation tenants. We also handle warehouse additions, where a client needs 20,000 to 60,000 more square feet attached to an operating building.
For aviation, McKinney National Airport is a general aviation airport in southeast McKinney that the city bought in 1979. The city reports a 2023 general aviation terminal expansion, approval in January 2025 of a $72 million commercial airline terminal on the east side, and Avelo Airlines service starting in November 2026. Those are reported facts and plans can change, but they suggest steady demand for hangars, ground-support equipment storage and airport-adjacent warehouses. Our aircraft hangar experience applies to long-span doors and apron paving.
McKinney sites often share boundaries with homes, schools or operating businesses. Our site safety plans cover perimeter fencing, controlled gates, flaggers for truck entry and exit, dust and mud control, and a clear line for neighbors who need to reach us. Crews are briefed daily on crane lifts, trenching and heavy equipment movements.
We follow a strict program for tilt-panel erection: engineered lift plans, rigging inspections, wind limits and exclusion zones around the crane. On hot days we adjust work hours for crews working on slabs and roof decks, because pouring and finishing concrete in Texas heat is both a quality and a safety issue.
The city's top employers in its 2024 annual financial report were Raytheon Intelligence & Space (4,200), McKinney ISD (2,920), Collin County (2,000), Globe Life (1,700) and Medical City McKinney Hospital (1,424). A defense and technology employer of that size supports a network of suppliers, many of which need clean, secure storage and light assembly rather than pallet-rack distribution. Healthcare and insurance employers need document storage, medical supplies and equipment staging.
These are not classic big-box users, and the buildings they need are smaller, more finished and sometimes more security-conscious. We build them with controlled access, enhanced lighting, upgraded HVAC in office areas and parking that matches staff counts. For users who ship product, we connect them with manufacturing and distribution design standards.
Close attention to the front end pays off here. Before design is final we walk the site after a heavy rain to see where water actually stands, ask the city for the drainage criteria that apply to the parcel and compare the soil borings against the proposed pad elevation. Those three checks take little time and tell the owner whether the schedule in the proposal is realistic or optimistic.
Send us the parcel, the use and your target date. We will build the weather-aware schedule, outline the budget and flag the approvals you will need.
Meaningfully, in spring. With about 41 inches of annual precipitation and May the wettest month, we plan earthwork and slab pours for drier windows when we can, and we carry a stated weather allowance in the bid. Subgrade stabilization helps reduce lost days.
Yes. Projects near the field must account for height limits and approach surfaces, and sometimes for coordination with the airport owner. We check those constraints first and set building height, crane positions and roof equipment locations accordingly.
U.S. 75 for north-south freight and U.S. 380 for east-west movement are the two primary routes, with SH 121 handling tollway access along the Allen border. We evaluate parcels by how a truck gets to each route from the site.
For many local users, yes. Contractors, suppliers and technology vendors typically need 5,000 to 20,000 square feet with office space and a few dock or grade-level doors. We help you test unit sizes against what comparable users pay.